With an equal understanding of client needs and manufacturer services, Access Electric Supply is able to provide individualized and timely solutions to each problem. Across sectors, we apply the same ‘can do’ mentality to every project ensuring the best solution – and not just the easiest solution – is the one utilized.

  • Gloved hands using tool to test electrical panel.

    Paper Mill Testing and Maintenance

    Equipment:

    Services, LV Switchgear, Circuit Breakers

    About The Project

    Papermills and other heavy industrial facilities with large power requirements often engage in annual testing and maintenance of their power distribution systems to ensure reliability. Numerous regional industrial facilities rely on Access Electric Supply to provide them with service technicians to perform services during their planned outages.

    Services include testing of high voltage, medium voltage and low voltage switchgear and circuit breakers, testing and oil sampling of transformers, battery testing, relay testing, maintenance, cleaning and torquing of power busses, etc. Test reports are generated for historical trending purposes and when components are identified as deficient, resources are deployed to repair or replace in an expedited fashion.

    These services help customers extend the life of their systems and ensure uptime during critical production hours. Reach out today if you have any questions about how we can help you maintain your gear.

  • Front view of large switchgear unit.

    Refinery Power Distribution Center (PDC)

    Equipment:

    MV Transformers, MV Bus Duct, LV Bus Duct, MV Switchgear, LV Switchboard, MCC’s, Panelboards, Transformers, Cable Tray

    About The Project

    A Puget Sound area refinery was looking for a ready-made solution to reduce install time and labor for power distribution within its plant. With our numerous OEMs and industrial background, Access was able to provide a manufactured building, built to the stringent Washington Gold Standard – while also adhering to a Class 1, Div 2 environment.

    This 60-foot long unit housed (3) switchboards, all fed with busway from outside the building, (6) MCC sections, as well as distribution panels. With this turnkey solution, Access provided the end user with a compact, clean electrical distribution solution that saved them significant field install time.

  • Retro-Fit Panels

    Equipment:

    Panelboards

    About The Project

    A Seattle area hospital with dozens of overdutied panels needed a solution to upgrade their panels with minimum downtime. After a field visit to verify existing conditions, Access partnered up with IEM to provide custom fitted, retro-fit panels.

    These panels used the existing cans to eliminate hours of demolition and the need to pull back conduits and wires. This solution allowed the contractor to mount a brand-new interior with properly rated breakers in a fraction of the time.

    In addition to mitigating arc flash concerns, these panels also provided new dead fronts and doors to give the hospital a fresh look, all while satisfying the end user with a lower-cost total install, with far less downtime for this critical facility.